Why Zambia
Zambia’s power deficit and growing industrial demand create strong fundamentals for bankable solar PV + storage projects.
Why the Copperbelt
High industrial demand
Mining and industrial loads in the Copperbelt require reliable supply and benefit from hybrid generation platforms.
Transmission infrastructure
Proximity to 330/220/132 kV infrastructure supports scalable evacuation pathways, subject to grid studies.
CapNova’s positioning
Zambia‑first development
We focus on disciplined local execution and regulatory alignment to unlock long-term investability.
Hybrid PV + BESS strategy
Battery systems improve dispatch flexibility and resilience, supporting peak demand and grid stability.
Scalable pipeline
We begin with 10 MW and expand to 30 MW and 50–100 MW as land and grid capacity are confirmed.