Projects & Milestones

CapNova is currently in the Land & Permitting phase for Copperbelt projects, designed for scalable grid connection and hybrid PV + storage operation.

PV Project Delivery (EPC)

Site survey, design, procurement, installation, commissioning, and handover documentation for utility and C&I solar PV.

Bankable Battery Storage (BESS)

Battery sizing, safety, controls, and integration for reliability and uptime — including hybrid configurations.

Grid-connected PV

Connection studies, protection coordination, testing, and performance validation aligned to utility requirements.

Engineering & Technical Advisory

System analysis, audits, IR scanning, and technical advisory support across development and operations.

Monitoring & Performance

Energy metering, EMS/BMS integration, dashboards, and optimization to drive performance and availability.

Hybrid & Backup Power

Solar + generator strategies, changeover control, and resilient power architecture for critical loads.

Contact

For project enquiries and partnerships, email info@capnovenergy.co.

Development Timeline

Phase 1 (0–3 months): Land & Permitting
Land identification, municipal engagement, preliminary grid corridor screening.
Phase 2 (3–9 months): Studies & Applications
ESIA, formal grid impact / feasibility study initiation, licensing pathway preparation.
Phase 3 (9–15 months): Structuring & Financing
Offtake discussions, investor/lender engagement, project company structuring.
Phase 4 (15–24 months): EPC & Commissioning
EPC appointment, construction, grid connection, commissioning.

Battery Storage – High-Level Assumptions

Phase 1 (10 MW)

Baseline: 10–20 MWh (1–2 hrs). Final sizing confirmed after grid studies and PPA structure.

Scale-up (30 MW)

Baseline: 60 MWh (2 hrs). Used for peak shifting, voltage support, and curtailment reduction.

Utility-scale (50–100 MW)

Baseline: 100–400 MWh (2–4 hrs). Enables hybrid dispatch and stronger offtake options.