Bankable Solar PV & Storage Development in Zambia
CapNova Energy Group develops grid-connected utility-scale Solar PV parks and Battery Energy Storage Systems (BESS) with a disciplined, grid‑first approach. We begin in the Copperbelt and scale from 10 MW to 30 MW and 50–100 MW hybrid platforms.
- Land & Permitting (Ndola, Kitwe, Lufwanyama corridor)
- Grid engagement (HV substations & evacuation corridors)
- Hybrid design (Solar + Storage)
- Investor readiness (data room structure)
What We Do
Solar PV Parks
Utility-scale PV development from 10 MW, designed for staged expansion to 30 MW and beyond.
Battery Storage (BESS)
Battery systems integrated from inception to support peak shifting, grid stability, and curtailment reduction.
Grid Connection Strategy
HV‑anchored site screening near 330/220/132 kV nodes to reduce evacuation risk and improve bankability.
Why CapNova
Bankability-first execution
We prioritize land security, permitting discipline, and grid certainty before scaling capital deployment.
- Structured development phases
- Risk-driven site selection
- Hybrid PV + BESS platform
Strategic Copperbelt footprint
We focus on regions with strong transmission infrastructure and industrial demand to support long-term offtake.
- Ndola → Kitwe → Lufwanyama axis
- HV evacuation corridors
- Scalable land parcels